Short Answer:

From first brief to final film, most projects take a few weeks: roughly one to three weeks of pre-production, the filming days themselves, then one to several weeks of editing depending on complexity. Larger or international shoots take longer, and rushed timelines usually cost more or compromise quality.

Overview

Video is a process, not a single event. The filming day is often the shortest part; the planning beforehand and the editing afterwards usually take the most time, and both are where quality is made.

Detailed Explanation

A typical timeline

  • Pre-production (1–3+ weeks): brief, script, scheduling, locations, and permissions.

  • Filming (1+ days): the shoot itself, per the shot list.

  • Post-production (1 week to several): editing, grading, sound, graphics, and revisions.

Simple corporate pieces can turn around in two to three weeks; ambitious or multi-location work runs longer. Building in time for revisions avoids a rushed, disappointing final cut.

Example

A straightforward interview film might be briefed, shot, and delivered within three weeks, while a multi-location campaign with animation can take a couple of months end to end.

Related Questions

Visit Us:


11b Clarence Works,

Leveson St,

S4 7ER

Call Us:

0114 312 4452

(Option 3)

Email Us:

info@kelham.productions

Follow Us:

Company No. 14718403

VAT No. 441938285

2026© Kelham Productions. All rights reserved.